As we enter 2025, I remain committed to supporting implementing higher-performing fenestration and façades in new and existing buildings. Façades are the linchpin of building performance. To name a few impacts, high-performance façades:
- Mitigate climate change through reduced operational carbon emissions;
- Facilitate the green energy transition by reducing electrical grid loads;
- Improve passive survivability for occupants during extended power outages;
- Improve occupant comfort, health and wellness; reduce operational energy costs; and
- Reduce embodied carbon by increasing façade longevity.

Last year, the Façade Tectonics Institute (FTI) completed a study for the U.S. Department of Energy identifying an array of barriers to adopting high-performance façades and a blueprint to overcome them. Over the past several months, these blogs have dived into the seven barriers identified and potential solutions (see these links for blogs from October, November, and December). This month focuses on the barrier that has been identified related to standard project delivery methods and their tendency to drive to the lowest cost and status quo solution selection.

Design-Bid-Build
The design-bid-build process is ubiquitous in North American building delivery. It involves a design team responsible for designing the building and its systems and specifying the required performance and/or components. Once the design is documented through drawings and standard written specifications, the project is sent to general contractors (GCs), who will submit competitive bids to the owner.
The bid winner will manage the construction of the building as specified. The comprehensive bid package from each GC typically comprises bids from various subcontractors for specialty scopes of work, such as the glazing contractor, the electrical contractor and the HVAC contractor. The GC may do some of the construction work themselves, or they may subcontract out the whole scope of work and manage the subcontractors in delivering the project.
The design-bid-build delivery system limits the implementation of higher performance or innovation in façades because:
- The bidding process leads to the lowest price and typically the lowest performance/value offer being chosen. Code minimum is the default, which often degrades building envelope performance in return for higher efficiency lighting, HVAC and hot water heating.
- It also limits the complexity and improved performance potential because of limited collaboration during the design phase between subcontractors, fabricators, material suppliers and the design team. This lack of collaboration further limits the development of value in façade performance and delivery.

Delegated Design
Overlaying “delegated design” onto the design-bid-build process, where the architect delegates part of the façade design to the glazing subcontractor, is becoming more popular. In this scenario, the subcontractor must meet the design criteria, ensure compliance with codes and standards, and create the design details.
Instead of increasing design value, delegated design often reduces the implementation of innovative systems and processes because it shifts design risk to the subcontractor. It does not necessarily increase collaboration; it can throw the design problem over the wall onto someone else’s desk. To minimize the perceived risk, the glazing subcontractor typically defaults to its status quo systems and processes—those that have been used before and are best known.
Last month, we reviewed the negative impact of subcontractor risk aversion on implementing higher-performance façades. These project delivery issues reinforce contractor risk aversion behaviors. This includes implementing a high price premium for non-standard high-performance options and code minimum façades, which stifles innovation and extends new technology adoption lifecycles.
GC Cost-Cutting Bonuses
Adding further to the barriers to higher performance and innovation and increasing the pressure to maintain the status quo through rinse-repeat specifications, GCs often receive bonuses to bring projects under budget. This can have unintended consequences for the façade. The FTI research identified GC cost-cutting behaviors, such as breaking the architect’s performance specification to reduce costs and bringing in lower-cost subcontractors uncomfortable with the complexity of higher-performance systems.

Solution: Involving the façade experts early
Involving the subcontractor, fabricator and material suppliers early in the design phase is the key to achieving high-performance façades while effectively managing perceived risk.
The FTI study identified, “The single largest lever we have seen that gets façade expertise to the table in early design is when codes have become significantly more stringent and focused on building envelope performance, such as in Massachusetts and Vancouver.”
Without stringent energy codes, changing the project delivery system from design-bid-build to alternative delivery processes may improve building performance through early design process collaboration. Examples of alternative delivery processes include Integrated Project Delivery (IPD), Public-Private Partnerships (P3) or design-build.
“The impact of better collaboration and communication is a reduction in time wasted, material waste, increase in efficiency and improved project outcomes,” noted the FTI study.
Integrated Project Delivery (IPD)
According to Horst Construction, “At its essence, Integrated Project Delivery (IPD) is a method designed to attack the construction process at its weak spot—communication.”
IPD involves collaboration between the design firm, the general contractor and the owner, often including specialty subcontracting expertise throughout the design and construction process. According to the Lean Construction Institute, in IPD projects, “key parties involved in the design, fabrication and construction aspects of a project are joined together under a single agreement.”

Design Build
In a design-build project delivery method, a single entity provides the owner with design and construction services. This provides just one point of contact for the building’s design and construction. This contrasts the design-bid-build process, where separate design and construction firms provide services to the owner.
By definition, the design-build team works closely together from the initial concept design, increasing communication and efficiency through rapid solutions to design and construction challenges. It is often touted as a lower-cost delivery method than traditional methods.

Public-Private Partnerships (P3)
In a P3 project, a public agency (e.g., a government agency) and a private entity enter into a contract to construct or renovate, operate, maintain and/or manage a facility. Typically, the agency retains ownership of the facility, but the partner invests some of its capital into its development. Resources, risks and rewards are shared.
The P3 contractual relationship allows for deviations from the traditional design-bid-build process since the owner is no longer the public entity. Any project delivery method, such as design-build or IPD, may be chosen to meet the needs of the P3 project.
Transforming Project Delivery?
While it is not guaranteed that the glazing contractor will be involved early when these alternative project delivery processes are used, there is a higher likelihood of higher quality façade design and delivery.
The market doesn’t change easily on its own. With code stringency moving sluggishly across most of the U.S., how can a transformation to more collaborative project delivery be achieved?
One of the ideas identified by FTI is the use of financial and other incentives to reward projects using collaborative delivery methods in which glazing contractors, façade fabricators and material suppliers are involved in the concept design phases. FTI noted evidence that in the rare cases where project delivery/structure incentives have been used, this has led to high-performance façades and mechanical, electrical and plumbing systems.
Next month, we will continue reviewing barriers to adopting high-performance facades, focusing on the challenges caused by HVAC-driven building design.
Great insights on how project delivery methods impact façade performance. We’ve found that early contractor involvement is especially important in custom home building and high-end renovations, particularly in coastal regions like Holmes Beach, Anna Maria Island, and Longboat Key. It’s encouraging to see more awareness around how integrated project delivery and design-build approaches can improve long-term performance and sustainability. Learn more about how we approach this at https://dospelconstruction.com/
Great insights on how project delivery methods impact façade performance. We’ve found that early contractor involvement is especially important in custom home building and high-end renovations, particularly in coastal regions like Holmes Beach, Anna Maria Island, and Longboat Key. It’s encouraging to see more awareness around how integrated project delivery and design-build approaches can improve long-term performance and sustainability.