Last month, we explored reasons why the fenestration systems installed in California do not seem to reflect the relative stringency of the fenestration systems in the prescriptive compliance path of the state’s Title 24 building energy code. One of reasons discussed relates to the widespread use of the performance code compliance path, which can allow higher performing internal systems to be traded off with a lower performing envelope. This month, I sat down (virtually) with two leaders in California’s glazing contractor community—Matt Kamper of Woodbridge Glass Inc./Werner Systems Inc. and Nick Bagatelos of Bagatelos Architectural Glass Systems—to dig deeper into the underlying dynamics.
According to Bagatelos, since cost is often the main driver, the typical outcome is the least expensive, minimally code compliant building. The installation of lower performing envelopes appears to be driven by the fact that using a more efficient mechanical system and high efficiency lighting is less expensive than investing in higher performance fenestration. This can lead to buildings with fenestration performance lower than the prescriptive requirements even when using higher than prescriptive window areas. This issue is not just isolated to California. As discussed in previous blogs, the performance paths of IECC and ASHRAE 90.1 used elsewhere in the country result in the same dynamic. But is it just about cost, or are there other drivers at play?
The fact that glazing contractors are not often brought to the table in early stages of the design process seems to be a significant issue influencing the delivered envelope performance. Their absence in the concept development phase severely limits their ability to positively impact the envelope design. According to Kamper, by the time glazing contractors are involved in the design process, the performance targets for the envelope components have already been set, and they often are not provided clarity on how they were derived.
Both Kamper and Bagatelos assert that the mechanical, structural and electrical trades are always in the room with the architect early – at the concept stage – but rarely is the glazing contractor invited. Kamper notes that the mechanical contractors offer their services for free and run building energy simulations in the early stages of concept development to validate the performance needed by the architect. In doing so, they have already implicitly made assumptions for envelope performance, and specified their mechanical system – even before the glazing contractor is involved in the discussion.
It seems that the mechanical subcontractors often set the stage for envelope performance and mechanical system design, plus the location of their scope. For example, they may decide whether to have drop ceilings through which to run ducts and electrical systems or use exposed ceilings. In the latter case the mechanical and electrical system components may need to be routed through the envelope, adding cost and complexity to the glazing contractor’s scope. While this added scope may seem to be good for the glazing contractor, according to Kamper, the additional cost is often unexpected and causes more value engineering focused on the envelope system.
In addition, most mechanical system suppliers have their own building energy simulation tools, which are focused on heating, ventilation and air conditioning system specification. According to Kamper, current software used to analyze building performance by the mechanical contractors has default values for the opaque wall elements (e.g. R30) that cannot be achieved by curtainwall spandrel. Spandrel can, at best, reach a thermal performance of approximately R10. This inaccurate assumption can lead to potential budget issues further along the process, because the performance has to be made up by improving the transparent elements at increased cost. Further increasing mechanical system size and/or upgrading its design may be a cheaper fix than improving the fenestration. Indeed, glazing contractors are often brought in to support value engineering exercises after the main design decisions are made.
Bagatellos argues that since glaziers are not involved early enough in the decision-making process, they are not able to make important counter arguments against choosing a poorer envelope relating to achieving high levels of occupant comfort, indoor environmental quality and building resilience. Not all energy equivalent building designs deliver the same result on these other high-performance building metrics. And these are arguments that may sway decisions on the extent of the envelope tradeoffs that the design team would be willing to make before the design is fixed.
Not being involved at the earliest stages of a project is not just a strategic business issue for our industry, it may also be an impediment to the design of holistically higher performing buildings—in terms of energy, human comfort and building resilience. So why are glazing experts generally not brought to the table earlier to support concept development? How can we partner more effectively with the developer and architectural community, and with other trades? These are important questions we need to answer to change this dynamic. Kamper and his colleagues in the NGA Installing committee are currently grappling with these questions and are encouraging active engagement in the dialogue.